MtKilimanjaro Travel Guide
MtKilimanjaro
Climb MtKilimanjaro
Email our kili experts!

Elevations and Distances for Lemosho Route


This is an outline of elevations, distances and hiking times for the Lemosho route. All of these are estimates and have a small margin of error depending upon where you measure them from, your pace of travel, and the exact trails you choose to take.

Lemosho Route Details

Day 1: Londorossi Gate to Mti Mkumbwa (2650 m/8,692 ft)
Hike time: 3hrs
Elevation Change: + 650 M/+2132
Estimation distance: 10 km
Final Elevation: 2650 m/8694 ft

Day 2: Mti Mkubwa (2650 m/8,692 ft) to Shira One Camp (3609 m/11,841 ft.)
Hike time: 5 – 6 hrs
Elevation change: + 950 M/+3116
Estimation distance: 12 km
Final Elevation: 3609 m/11,841 ft

Day 3: Shira One Camp (3609 m/11,841 ft.) to Shira Two Camp (3849 m/12,628 ft.)
Hike time: 5 to 6 hrs
Elevation change: + 240 M/+787 ft
Elevation distance: 5 km
Final elevation: 3849 m/12,628 ft.

Day 4: Shira Two Camp (3849 m/12,628 ft.) to Barranco Hut (3948 m/12,956 ft.)
Hike time: 5 hrs
Elevation change: +100 M/+328 ft
Estimated distance: 6 km
Final elevation: 3948 m/12,956 ft.

Day 5: Barranco Hut (3948 m/12,956 ft.) to Karanga Valley (4190 m/13,743 ft.)
Hike time: 3.5 hrs
Elevation change: +240 m/+787 ft
Estimated distance: 4km
Maximum elevation: 4190 m/13,746 ft
Final elevation: 4000 m/13,123 ft

Day 6: Karanga Valley (3963 m/13,000 ft) to Barafu Hut (4,600 m/15,091 ft)
Hike time: 3.5 hrs
Elevation change: +600 m/+1968 ft
Estimated distance: 4km/2.5 miles
Final elevation: 4,600 m/15,091 ft

Day 7: Barafu Camp (4,600m/15,091 ft) to the Summit/Uhuru Peak (5896 m/19,343 ft) and then to Mweka Camp (3100 m/10,170 ft)
Summit time: 7 hrs
Elevation change: +1300 m/+4265 ft
Estimated distance: 5km/3.2 miles
Final elevation: 5896 m/19343 ft
Descent time: 5 hrs
Elevation change: -2800 m/-9186 ft
Estimated distance: 12km/7.5 miles
Final elevation: 3100 m, 10,170 ft

Day 8: Mweka Hut (3100 m/10,170 ft) to Mweka Gate (1828 m/6,000 ft) to Moshi Town
Descent time: 4 hrs
Elevation change: -1250 m/-4101 ft
Estimated distance: 10km/6.21
Final elevation: 1828 m/6000 ft



By Peter Baxter | Permalink | 1 comment | September 27th, 2005
Tags: Resources, Routes up Kilimanjaro
Related posts

Comments

By Francesca | January 24th, 2006
Corner

I think I’m wanna try this route the next time I go….

Corner

Mt. Kilimanjaro News



Read more archives

RSS Feed Subscription

 

Reader Comments

Climb Kilimanjaro on Add Adventure Trips to Kili Trek for Trip of a Lifetime
If you travel all the way to Tanzania to climb Kilimanjaro its worth taking atleast a few days ontop...

Shu on Historic Kilimanjaro
Hi Angie...Climbed Kili in September 2010 and had the most incredible experience of my life. Went wi...

Catherine on Historic Kilimanjaro
My brother is planning to climb kilimanjaro with this company http://www.footlooseadventure.co.uk/ki...

angie on Historic Kilimanjaro
Hi Eric, I'm glad you summited with no problems! Way to go!! My boyfriends trek also had rather b...

eric on Historic Kilimanjaro
climbed it this past June with no climbing experience. We had amazing guides though! @Angie-it is ...